ZTE Corporation RSU82C Manuale Utente

Pagina di 55
ZXSDR RSU82C User Manual
Figure 5-10 Installing the RSU Monitoring Cable
– End of Steps –
5.3 Installing Optical Fibers Between BBU and RSU
Prerequisites
l
The ESD wrist strap must be worn.
l
The baseband power cabinet and the RF cabinet have been independently installed.
Context
When the baseband power cabinet and the RF cabinet are installed side by side or they
are far away from each other, you need to connect BBU and RSU using optical fibers.
Pay attention to the following points when installing optical fibers:
l
Do not damage the optical fiber cladding during operations.
l
Protect optical fiber connectors and avoid contaminating them.
l
Do not forcibly bundle optical fibers.
l
Curve optical fibers at the turning.
Steps
1.
Affix a temporary label.
5-10
SJ-20101019140047-001(R1.2)|08/08/2011
ZTE Proprietary and Confidential