ZTE Corporation ZXMBW-E9200 Manuale Utente

Pagina di 63
 
ZXMBW E9200 Indoor Pico Base Station User Manual
 
 
 
36      
Confidential and Proprietary Information of ZTE CORPORATION 
F
I G U R E  
2 5
 
Z X M B W
 
E 9 2 0 0
 
C
A B I N E T  
I
N S T A L L A T I O N  
P
A R T S
 
 
1
2
 
          1. Expansion bolt   2.Installation plate 
2.  Mount the cabinet on the installation plate, and insert the 4 
hex flange bolts at the back of the cabinet through the larger 
parts of the cucurbit holes on the plate. 
3.  Move the inserted 4 hex flange bolts into the smaller parts of 
the cucurbit holes to fix the cabinet to the plate. 
4.  Tighten the 4 hex flange bolts 
E
ND OF 
S
TEPS
Pole-mount Installation 
The following describes the pole-mount installation procedure of 
ZXMBW E9200 cabinet. 
The following accessories are required for pole-mount 
installation. 
 
One installation plate 
 
4 expansion bolts and 4 hex flange bolts  
 
Hoops         
 
Fastening tools 
Perform the following steps to install the cabinet as pole-mount 
mode. 
1.  Mount the Installation plate on the pole with using the hoops 
and fix it with four expansion bolts. 
Installation 
Accessories 
Steps