ZTE Corporation ZXMBW-E9230 Manuale Utente

Pagina di 71
ZXMBW E9230 User Manual
F
IGURE
48 A
NTENNA
D
OWNTILT
A
DJUSTMENT
iii. After adjusting the downtilt of the antenna, tighten the fas-
tener "B.
E
ND OF STEPS
Installing Feeder Grounding Kit
Prerequisites
Install the feeder.
Prepare required tools including paper knife, flat head screw-
drivers, and wrench and sharp-nose pliers.
Steps
1. Peel off 7/8" sheath according to size of grounding clip at the
positions.
illustrates structure of grounding kit.
F
IGURE
49 G
ROUNDING
K
IT
S
TRUCTURE
1.
Grounding terminal
2.
Grounding cable
3.
Feeder cable
4.
Grounding spring lock
5.
Feeder external copper core
6.
Grounding cable copper piece
2. Lay the grounding cable facing to the ground network. Avoid
bending or folding.
And keep the included angel between
grounding cable and feeder cable less than 15°.
54
Confidential and Proprietary Information of ZTE CORPORATION