Afimilk Agricultural Cooperative Ltd. 4256000 Manuale Utente

Pagina di 121
Oct 2013
AfiAct II™ User Manual
16
Introduction
Chapter 
1
1.5 Prerequisites 
For correct functionality, the AfiAct II system must be properly installed; then, tags 
and data must be maintained on a regular basis: 
1.  Installation verification: Verify that the system has been properly installed, 
mandatory data has been entered, and AfiTags II have been attached to the 
animals (see AfiAct II installation manual, referred documents, page vii). 
2.  Daily AfiTag II maintenance: Manage tags of animals removed from or added 
to the AfiAct II group, see chapter 2
3.  Daily (per session) data maintenance: Enter mandatory events into the 
system on a regular (per session) basis, see chapter 7
NOTE 
If the number of sessions are changed, contact afimilk representative to re-
configure the system. 
NOTE 
AfiActII analysis is based on deviations from the normal behavior of the cow. 
To calculate the average activity level AfiAct must calculate a baseline
average. This requires at least 3-5 days readings (including all sessions per 
each day) of cow activity.