Honeywell International Inc. 8DL5800STAT Manuale Utente

Pagina di 12
WIRELESS THERMOSTAT
69-1535
8
INSTALLER SYSTEM TEST
Use the Installer System Test to check the thermostat 
operation. Refer to Table 4 for a list of the available 
Installer System Tests.
CAUTION
Equipment Damage Hazard.
Compressor damage can result if compressor 
is cycled too quickly.
Be aware that compressor minimum off time is 
bypassed during the Installer System Test.
To start the system test:
1.
Press and hold increase 
 and decrease 
▼ 
at the 
same time until 10 appears. 
2.
Observe all segments of the display are displayed 
before the 10 appears. See Fig. 9 and 10. 
Fig. 9. LCD segments display.
Fig. 10. Test number display.
Refer to Table 5 for the instructions and description of the 
specific tests.
NOTE:
Press Time 
 to advance to the next test and 
press Time 
▼ 
to go back to the previous test. 
Press Run Program to exit the system test.
NOTE:
Press any key and the displayed number will change. Press TIme 
 to go to the previous test and Time
 ▲ 
to 
go to the next test. The Run Program key will not exit this test. Press Time  
 or Time 
▼ 
and then the Run 
Program key to exit.
Table 4. Tests Available in Installer System Test.
Test Number
System Test Description
10-19
Heating equipment can be turned 
on and off.
30-39
Cooling equipment can be turned 
on and off.
40-49
Fan equipment can be turned on 
and off.
60 0 to
60 19
Keyboard keys test.
70-79
Thermostat information, including 
date code and software versions, 
are displayed.
M14559
Aux Ht
Set Day/Time
Set Program
Mon
Wake Leave Return
Sleep
Outdoor
Room
Filter
Wait
System
Fan
Em Heat
On
Auto
Off
Cool
Auto
AM
PM
Hold for
Heat
Cool
Repl Batt
Recovery
DST
Tue Wed Thu Fri Sat Sun
Days
Temporary Setting
Em Ht
M14612
Table 5. Installer System Test Options.
Key to Press
Test Number
Description
Heating Equipment System Test
Time
10
Enter heating equipment system test.
11
Heat comes on. When Installer Setup number 2 is 1, the system fan is also 
energized.
12
Heat and system fan turn off.
Cooling Equipment System Test
Time
30
Change from heating to cooling equipment system test.
31
Cool and system fan come on.
30
Cool and system fan turn off.
Fan Equipment System Test
Time
40
Change from cooling to fan equipment system test.
41
Fan comes on.
40
Fan turns off.
Key Operation System Test
Time
60 2
Change from fan to key operation system test.