B. System Checkout
(1) General
Installation of the MILACAS-FR system requires three stages of testing to ensure the 
proper operation of the system components. First, do a check of the system interwiring 
prior to installation of the MILACAS-FR processor and display units. This check makes 
sure that the aircraft and all system intraconnections are correct before power is 
applied. After the units are installed, make a visual inspection of the equipment and 
connections. The post-installation test is used to apply power and do a functional 
check of the system. Successful completion of the post-installation test makes sure 
that the system works correctly.
(2) System Interwiring Check
Check the aircraft and transponder system interconnections, with the steps that follow:
(a) Check that all cables and interwiring are installed in accordance with the 
interwiring and cable fabrication instructions.
(b) Check that the functions that follow are properly strapped to reflect the aircraft 
system configuration:
1
Cable Delay Program
2
Aircraft Altitude Limit Program
3
Type of Analog Radio Altimeter Select
4
TA/RA Display Symbol Maximum Program
5
Ground Display Mode
Table 2001.   Inspection/Check Procedure
Equipment
Inspection/Check Procedure
MILACAS-FR Processor 
(1) Inspect for any sign of damage.
(2) Check that unit is properly installed and that 
retaining mechanism and connectors are securely 
tightened.
Directional Antenna
(1) Inspect for any sign of damage.
(2) Check that antenna has been properly installed 
and all mounting screws are firmly tightened.
(3) Make sure that the four coaxial connectors are all 
properly mated to antenna.