Honeywell International Inc. KTR2280 Manuale Utente

Pagina di 74
n
 KTR 2280 Preliminary H 08/17/06
Rev. 0, Aug/2006   
©Honeywell International Inc. Do not print without express permission of Honeywell
Page 2-29
2.4 POST-INSTALLATION CHECKS
2.4.1 KTR 2280 MMDR SYSTEM CHECKOUT 
The post-installation test is used to apply power and functionally checkout the system.  
Successful completion of the post-installation test verifies the proper operation of the KTR 
2280 MMDR.
 is a visual inspection/check procedure 
that should be performed after system installation as part of a system checkout.  A 
post-installation test per paragraph 
 should be performed.  In addition, the procedure should be used as a 
periodic maintenance inspection check.
TABLE 2-5  INSPECTION/CHECK PROCEDURE
2.4.1.1 INSPECTION
Perform the following inspection on the overall system:
(1) 
Check that cables do not interfere with aircraft controls or other equipment.
(2) 
Check cabling for proper routing and check security of tie-down points.  In-
spect and adjust cable runs to ensure that cables are not strained, kinked, 
or severely twisted and are not exposed to rough or sharp surfaces.
EQUIPMENT
INSPECTION/CHECK PROCEDURE
KTR 2280
 A.  Inspect external surface for damage.
MMDR
 B.  Check that the unit is securely installed and that retaining
       mechanism is securely tightened.
 C.  Ensure that all connections in the mounting tray are properly
       mounted and secure.
Antennas
 A.  Inspect external surfaces for damage.
 B.  Check that antenna is properly mounted and mounting
       screws are tight.
 C.  Ensure that antenna coaxial cable connectors are properly
       mated and secure.