Tele 1341500 E3LM10 Gamma Fill Level Monitoring Relay Fill level monitoring 1341500 Scheda Tecnica
Codici prodotto
1341500
Subject to alterations and errors
Functions
E3LM10
Pump up
Connection of the probe rods E1, E2 and E3. Alternatively the electri-
cally conducting container can be connected in lieu of the test probe E3.
When the air-fluid level falls below the minimum probe E2 the set interval
of tripping delay (Delay ON) begins. After the expiration of the interval,
the output relays R switches into on-position (yellow LED illuminated).
When the air-fluid level again rises above the maximum probe E1, the
set interval of turn-off delay (Delay OFF) begins. After the expiration of
the interval the output relays R switches into off-position (yellow LED not
illuminated).
Connection of the probe rods E1, E2 and E3. Alternatively the electri-
cally conducting container can be connected in lieu of the test probe E3.
When the air-fluid level falls below the minimum probe E2 the set interval
of tripping delay (Delay ON) begins. After the expiration of the interval,
the output relays R switches into on-position (yellow LED illuminated).
When the air-fluid level again rises above the maximum probe E1, the
set interval of turn-off delay (Delay OFF) begins. After the expiration of
the interval the output relays R switches into off-position (yellow LED not
illuminated).
Pump down
Connection of the probe rods E1, E2 and E3. Alternatively the electrically
conducting container can be connected in lieu of the test probe E3.
When the maximum probe E1 gets moistened the set interval of tripping
delay (Delay ON) begins. After the expiration of the interval the output
relays R switches into on-position (yellow LED illuminated). When the
air-fluid level falls below the minimum probe E2, the set interval of
turn-off delay (Delay OFF) begins. After the expiration of the interval, the
output relays R switches into off-position (yellow LED not illuminated).
Connection of the probe rods E1, E2 and E3. Alternatively the electrically
conducting container can be connected in lieu of the test probe E3.
When the maximum probe E1 gets moistened the set interval of tripping
delay (Delay ON) begins. After the expiration of the interval the output
relays R switches into on-position (yellow LED illuminated). When the
air-fluid level falls below the minimum probe E2, the set interval of
turn-off delay (Delay OFF) begins. After the expiration of the interval, the
output relays R switches into off-position (yellow LED not illuminated).
Minimum monitoring (Pump up)
Connection the probe rods E2 and E3 (bridge E1-E3). Alternatively the
electrically conducting container can be connected in lieu of the test
probe E3.
When the air-fluid level falls below the probe E2 the set interval of tripping
delay (Delay ON) begins. After the expiration of the interval, the output
relays R switches into on-position (yellow LED illuminated). When the
air-fluid level again rises above the probe E2, the set interval of turn-off
delay (Delay OFF) begins. After the expiration of the interval the output
relays R switches into off-position (yellow LED not illuminated).
Connection the probe rods E2 and E3 (bridge E1-E3). Alternatively the
electrically conducting container can be connected in lieu of the test
probe E3.
When the air-fluid level falls below the probe E2 the set interval of tripping
delay (Delay ON) begins. After the expiration of the interval, the output
relays R switches into on-position (yellow LED illuminated). When the
air-fluid level again rises above the probe E2, the set interval of turn-off
delay (Delay OFF) begins. After the expiration of the interval the output
relays R switches into off-position (yellow LED not illuminated).
Maximum monitoring (Pump down)
Connection of probe rods E2 and E3 (bridge E1-E3). Alternatively the
electrically conducting container can be connected in lieu of the test
probe E3.
When the probe E2 gets moistened the set interval of tripping delay
(Delay ON) begins. After the expiration of the interval the output relays
R switches into on-position (yellow LED illuminated). When the air-fluid
level sinks below the probe E2, the set interval of turn-off delay (Delay
OFF) begins. After the expiration of the interval the output relays R swit-
ches into off-position (yellow LED not illuminated).
Connection of probe rods E2 and E3 (bridge E1-E3). Alternatively the
electrically conducting container can be connected in lieu of the test
probe E3.
When the probe E2 gets moistened the set interval of tripping delay
(Delay ON) begins. After the expiration of the interval the output relays
R switches into on-position (yellow LED illuminated). When the air-fluid
level sinks below the probe E2, the set interval of turn-off delay (Delay
OFF) begins. After the expiration of the interval the output relays R swit-
ches into off-position (yellow LED not illuminated).
U
Probe E1
Probe E2
Probe E3
Level
U
Probe E2
Probe E3
Level
U
Probe E1
Probe E2
Probe E3
Level
U
Probe E2
Probe E3
Level
Note
Use cables with low capacity for wiring the probes especially with extended wiring length.
Use cables with low capacity for wiring the probes especially with extended wiring length.
Following processes are suggested for the adjustment:
- The existent time delay should be to minimum (0,5s).
- The function selector switch must be in position pump down.
- The function selector switch must be in position pump down.
- Turn the sensitivity controller slowly clockwise from min to max until the relais switches into on-position. (probes must be in dipped state)
- The moistened probes should be taken out of the liquid to control if the relais switches into off-position.
If the relais doesn't switch into off-position, turn the sensitivity controller slightly back to min. (counter clockwise)
- The moistened probes should be taken out of the liquid to control if the relais switches into off-position.
If the relais doesn't switch into off-position, turn the sensitivity controller slightly back to min. (counter clockwise)
- Set the existent time delay to desired value to fade out a short term moisten the probes by waves in the liquid.
- Set the function selector switch to desired position. (either pump up or pump down)
- Set the function selector switch to desired position. (either pump up or pump down)