HP Performance Optimized Data Center (POD) 20cp Guida All'Installazione Rapida

Pagina di 38
 
Site requirements  11 
Grounding requirements 
The HP POD 20c structure and internal components are all bonded together. A common grounding electrode 
conductor connection point is provided on the utility-end cold aisle. 
   
 
WARNING:
  To avoid the risk of personal injury or electric shock, the HP POD 20c must be 
properly grounded (earthed) in accordance with national, regional, and local regulations. 
   
The following is a list of component requirements for grounding and bonding: 
• 
Grounding of the HP POD 20c must comply with the requirements of IEC 364 and any applicable 
national, regional, and local regulations. 
• 
Bonding of the piping systems and any exposed structural steel installed to support the HP POD 20c 
must be in accordance with IEC 364 and any applicable national, regional, and local regulations. 
 
Grounding feature 
Specification 
Earthing (grounding) 
electrode conductor 
pad 
 
The earthing (grounding) electrode conductor connection bus pad is located on the 
outside of the HP POD 20c on the hot aisle side of the utility end of the POD and 
below the transformer cabinet. 
 
The earthing (grounding) pad must be connected to the grounding electrode system 
or building steel in accordance with IEC 364 or equivalent regulation. 
Grounding lugs 
 
Grounding lugs cannot be attached to any painted surface. 
 
Grounding lugs must be compression-type 2-hole lugs and UL listed specifically for 
grounding. 
Earthing (grounding) 
rod system or ground 
well 
The customer must provide an effective earthing (grounding) system with a ground rod 
or a ground well. 
 
   
 
IMPORTANT:
  Before installing the HP POD 20c, consult your local Authorities for applicable 
regulations and to review site-specific location guidelines. If needed, obtain any necessary 
permits. 
   
The following figure shows the earthing (grounding) electrode conductor connection that is located on the 
cold aisle of the HP POD 20c.