GE Alterrex Diode Scheda Tecnica

Pagina di 4
You retain your existing cubicle, overhead bus-work, and cabinet
doors. We replace the diode rectifier, refurbish the on-line repair
switch, replace the manifolds with stainless piping and valves,
On-Site
Factory Installation
Electrical Scope
Field Service
Level 1
Level 2
Remove existing diode banks
X
X
X
Remove existing wiring
X
X
X
Remove existing annunciation devices
X
X
X
Clean/inspect 5-Pole switch
X
Refurbish 5-Pole Switch (resilver contacts)
X
X
Install new diode bridges
X
X
X
Install new bridge wiring harnesses
X
X
X
Install new interface module
X
X
X
Install new annunciator panel
X
X
X
Electrical validation testing
X
X
X
Mechanical Scope
Field Service
Level 1
Level 2
Remove all existing copper tubing
X
X
X
Remove existing isolation valves
X
X
X
Install new stainless steel isolation valves
X
X
X
Install new stainless stator water connection manifold
X
X
X
Route new cooling water hoses (stainless clad)
X
X
X
Flow and pressure testing
X
X
X
Stator water flow calibration
X
X
X
Cabinet Scope
Field Service
Level 1
Level 2
Install new Lamicoid lables
X
X
X
Strip, prep and powder coat cabinets (interior and exterior)
X
Inspect/repair door gaskets
X
Inspect/repair door handles and locking mechanism
X
Replace door-mounted filter racks and filters
X
and provide a new, more reliable diagnostic indicator panel.
GE is helping you reset the clock on the Alterrex diode system.