Bunn VLPFCanada Manuale Proprietario

Pagina di 28
Page 22                                    
If continuity is not present as described, replace the 
switch.
Removal and Replacement:
1.  Remove all wires from the switch terminals.
2.  Compress  the  clips  inside  the  hood  and  gently 
push the switch through the opening.
3.  Push the new switch into the opening and spread 
the clips to hold the switch captive in the panel.
4.  Refer to FIG. 15 when reconnecting the wires.
FIG. 15 ON/LEFT SWITCH TERMINALS
WHI to Right switch
WHI to Left warmer
BLK to Right switch
BLK to Cordset
WHI/RED to Start switch
WHI/VIO to Left warmer
P1987
SERVICE (cont.)
Location:
 
The On/Left switch is located in the front of the 
hood, above and to the left of the brew funnel.
Test Procedure:
1.  Disconnect the brewer from the power source and 
remove the wires from all three terminals of the 
On/Left switch.
2.  With  a  voltmeter,  check  the  voltage  across  the 
black and white wires. Connect the brewer to the 
power source. The indication must be 120 volts 
ac.
3.  Disconnect the brewer from the power source.
If voltage is present as described, proceed to #4.
If voltage is not present as described, refer to the Wir-
ing Diagram and check the brewer wiring harness.
4.  Check for continuity across the two terminals on 
the left side of the switch when it is in the upper 
position. Continuity must not be present across 
these terminals in the lower position.
If continuity is present as described, reconnect the 
wires, the switch is operating properly.
ON/LEFT SWITCH
P2172.80
FIG. 14 ON/LEFT SWITCH
10179 060100