Znyx Networks bh5700 Manuale Utente

Pagina di 359
  # Fabric portions of the 7100 switch.  The actual coordination 
is dependent on the
  # setting of the board_synchronization_mode and the 
failover_mode.  In
  # switch failover_mode the number of up links in both switch 
planes is
  # considered.  In vlan and port failover mode they are not.  In 
all
  # failover_modes, if the data plane or fabric plane switch 
reboots or
  # power cycles, the HA partner will take mastership for all 
VLANs in
  # both planes.  board_synchronization is off by default. 
"basic" is the
  # only supported mode at this time.  The same mode must be set 
in both
  # the base and fabric switches.
#board_synchronization_mode: basic;
  # vrrpd_script:  Allows the user to add scripts to be executed 
during
  # vrrpd state transitions.  These scripts are run from the end 
of the
  # /etc/rcZ.d/surviving_partner/vrrpd.script file.  The user 
provided
  # script must be well behaved.  If it crashes, or hangs or 
delays it will
  # effect the SurvivingPartner performance.  The script is not 
run in
  # backround.  If this is needed, have your script background 
itself.
#vrrpd_script: /etc/rcZ.d/surviving_partner/my_vrrpd_script;
#vrrpd_script: /etc/rcZ.d/surviving_partner/my_vrrpd_script2;
Ethernet Switch Blade User's Guide
release  3.2.2j
page 41