Vogelzang International Stove TR008 Manuale Utente

Pagina di 22
Page 0 
DURANGO™
 
TR008 / 050207.2
FlOOR PROTECTOR mATERIAl CAlCUlATIONS
This stove has been tested for and must be installed on a floor protector with the proper Thermal 
Resistance or R-value as stated in the installation instructions on page 3, “Locating Stove” step 1, of 
this manual. If the floor protector materials listed in the instructions are not available, materials with 
an equivalent R-value may be substituted. 
Alternate  materials  may  be  rated  with  C-factor  (Thermal  Conductance)  or  k-factor  (Thermal 
Conductivity) ratings which must be converted to R-value to determine if the alternate material meets 
the tested requirements. The following instructions provide the proper information and formulas for 
conversion to R-value.
To determine if alternate materials are acceptable follow this sequence.
1.  Convert material specifications to R-value:
 
a. R-value given — no conversion necessary
 
b. k-factor is given with a required thickness (T) in inches:
 
 
R = 1/k x T
 
c. C-factor is given: R = 1/C
2.  Determine the R-value of proposed alternate floor protector:
 
a. Use formulas in step 1 above to calculate R-value of proposed material(s). 
 
b. For multiple layers, add R-values of each layer to determine overall R-value.
3.  If the overall R-value of the floor protector system is equal to or greater than the floor protector 
specifications given, the alternate is acceptable.
Definitions:
 
Thermal conductance (C) =  
BTU 
W
 
 
(hr)(ft
2
)(°F) 
 
(m
2
)(°K) 
 
 
Thermal conductivity (k) = 
(Btu)(inch) 
Btu 
 
 
(hr)(ft
2
)(°F) 
 
(m)(°K) 
 
(hr)(ft)(°F) 
 
 
Thermal resistance (R) = 
(ft
2
)(hr)(°F) 
(m
2
)(°K) 
 
 
Btu 
 
Example:
The specs of floor protector material should be 3/4-inch thick material with a k-factor of 0.84.
The proposed alternative material is 4” brick with a C-factor of 1.25 over 1/8-inch mineral board 
with a k-factor of 0.29.
Step 1: Convert specs to R-value. 
 
 
R = 1/k x T = 1/0.84 x 0.75 = 0.893   System must have a R-value of 0.893 = Rspecs
Step 2: Calculate R-value of individual components
 
 
4” Brick with C-factor = 1.25.  R = 1/C = 1/1.25 = 0.80 = Rbrick
 
 
1/8-inch (0.125”) mineral board with k-factor = 0.29. R = 1/0.29 x 0.125 = 0.431 = Rmin.brd.
Step 3: Add R-values of components to get total R-value of system
 
 
Rbrick + Rmin.brd = 0.80 + 0.431 = 1.231 = Rsystem
Step 4: Compare Rsystem to Rspecs
 
 
Rsystem  =  1.231  is  larger  than  Rspecs  of  0.893.  System  R-value  exceeds    the  required  
 
 
specifications and therefore is an acceptable alternative.