Premier Floors Manuale Utente

Pagina di 56
20
Walls
Time should be spent to organize the job site. 
Set out the panels in the order you are going to 
use them.  Get all your tools onto the floor deck, 
including: 
•  Foam scoop 
•  Marker 
•  Flat dolly—for moving panels around the deck  
(A come-along or truckers ratchet straps is 
not needed, but may prove useful.) 
steP 1. BottoM Plate 
Wall panels are placed over a dimensional 
bottom plate that fits in the recess in the wall 
panel.  Refer to your panel layout drawings for 
the location of the bottom plate.  The plate will 
be measured 1/2” in from the outside edge 
of your floor.  Snap a chalk line on the floor, 
equal to the plate width + 1/2” to represent the 
inside edge of the bottom plate.  Panel skins 
should run flush to the floor edge.  Apply double 
3/8” lines of Premier Mastic 1” from the edge 
of the plate and nail it off with (3) 16d nails per 
floor joist or 12” o.c. to floor system below, or 
as required by code.