Check the panel dimensions 
against the floor layout.  
Apply a 3/8” diameter bead 
of Premier Mastic along the 
sides and down the center of 
the bottom plate.  Slide the 
panel into position.  Lift the 
panel over the bottom plate 
by using either manpower or 
mechanical means.  After the 
panel is standing, check for proper placement.  
Next, plumb the wall section in both directions 
and fasten it to the plate and the adjacent 
panel with the specified fasteners.  If necessary, 
brace the wall before moving to the next panel.
steP 4. adJaCent Panel 
Move the next panel into position and apply 
Premier Mastic in the same manner as with 
the first panel.  On this panel you will run 
an additional 3/8” diameter bead of mastic 
down the center of the foam-to-foam interface. 
Place splines on the floor and run the Mastic 
down one side and up the other, approximately 
1/4” from the edge on the spline.