NEC NP600CM Manuale Utente

Pagina di 10
ISSUED: 08-05-08  SHEET #: 056-9008-1
Visit the Peerless Web Site at www.peerlessmounts.com
5 of 10
For customer care call 1-800-865-2112 or 708-865-8870.
Place projector mount assembly (A) on ceiling as a template and mark the center of the two mounting holes. Make
sure that the mounting holes are in the center of the wood joist. Drill two 5/32" (4 mm) dia. holes to a minimum
depth of 2.5" (64 mm). Attach projector mount assembly (A) with two #14 x 2.5" (6 mm x 65 mm) wood screws (F)
and two flat washers (E) as shown in figure 2.4 or figure 2.5 depending on joist orientation. Tighten wood screws (F)
using 3/8" (10 mm) socket wrench, phillips screwdriver or 10mm open end wrench until projector mount
assembly (A) is firmly attached.
Skip to step 3.
F
F
A
WOOD JOIST
FRONT OF
MOUNT
E
E
WOOD JOIST
A
• Tighten wood screws so that projector mount assembly is firmly attached, but do not overtighten. Overtightening can
damage the screws, greatly reducing their holding power.
• Never tighten in excess of 80 in • lb (9 N.M.).
• Make sure that mounting screws are anchored into the center of the studs. The use of an "edge to edge" stud finder is
highly recommended.
WARNING
FRONT OF
MOUNT
ACCESS SLOT FOR
OPEN END WRENCH
ALLOWS TIGHTENING
OF WOOD SCREW (F)
WITHOUT REMOVING
PROJECTOR
Installation To Wood Joist Ceilings
2
fig. 2.4
fig. 2.5