Digidesign Control 24 Manuale Utente

Pagina di 159
 
Chapter 6: Starting Up and Configuring Control|24
 
35
 
Chapter 6: Starting Up and Configuring 
Control|24
 
Starting Up and Shutting 
Down a System
 
Pro Tools systems components must be turned 
on and shut off in a specific order.
 
Start your Pro Tools System in this order:
 
1  
 
Turn on external hard drives. Wait 10 to 15 
seconds for them to come up to speed. 
 
2  
 
Turn down or mute monitor levels on Con-
trol|24 to avoid loud sounds on power up.
 
3  
 
Turn on Control|24. 
 
4  
 
Turn on any MIDI interfaces and other MIDI 
devices. 
 
5  
 
Turn on audio interfaces. 
 
6  
 
Turn on the computer. 
 
7  
 
Turn on the monitoring amplifier and speaker 
system. 
 
Shut down Pro Tools in this order:
 
1  
 
Turn off the monitoring amplifier and speaker 
system.
 
2  
 
Turn off audio interfaces.
 
3  
 
Shut down the computer.
 
4  
 
Turn off MIDI interfaces and other MIDI de-
vices. 
 
5  
 
Turn off Control|24.
 
6  
 
Turn off external hard drives. 
 
Software Installation
 
The Pro Tools Installer automatically installs all 
Control|24 software as part of a normal installa-
tion. If you have not yet installed Pro Tools, re-
fer to the 
 
Getting Started Guide 
 
that came with 
your system.
 
Power down your monitor system, and 
make sure the levels are all the way down 
on your amplifiers before turning Con-
trol|24 on or off. A loud pop can occur dur-
ing power cycling that could possibly dam-
age playback systems.