BENDIX SD-08-2412 Manuale Utente

Pagina di 28
6
OPERATION & LEAKAGE TESTS
1.  Test the outlet port check valve assembly by building 
the air system to governor cut-out and observing a test 
air gauge installed in the #1 reservoir. A rapid loss of 
pressure could indicate a failed outlet port check valve. 
This can be confi rmed by bleeding the system down and 
removing the check valve assembly from the end cover.  
Once this has been done, subject air pressure to the 
unit and apply a soap solution to the check valve side. 
Leakage should not exceed a 1” bubble in 1 second.
2.  Check for excessive leakage around the purge valve. 
With the compressor in loaded mode (compressing 
air), apply a soap solution to the purge valve housing 
assembly exhaust port and observe that leakage does 
not exceed a 1” bubble in 1 second. If the leakage 
exceeds the maximum specifi ed, service the purge 
valve housing assembly.
3.  Close all reservoir drain cocks. Build up system 
pressure to governor cut-out and note that the air dryer 
purges with an audible escape of air. “Fan” the service 
brakes to reduce system air pressure to governor 
cut-in. Note that the system once again builds to full 
pressure and is followed by an air dryer purge.