inStallation inStructionS
note: For additional information regarding the parts listed in the following pages, refer
to the Assembly Diagram near the end of this manual.
This item’s brackets can be bolted directly onto a solid concrete wall, using ap-
This item’s brackets can be bolted directly onto a solid concrete wall, using ap-
propriate lag bolts and washers (not included). Due to the leveraging forces
created, this item will require a Header board (not included) if installed onto any
non-concrete structure.
Install proper scaffolding (not included) to allow safe access to the installation
Install proper scaffolding (not included) to allow safe access to the installation
area. Utilize safety equipment as required for the height you are working at.
to
prevent serious injury, follow all instructions and precautions provided with
the scaffolding you will use.
risk of serious personal injury from electric shock or other
hazards from damaged utility lines.
Verify that installation surface has no hidden utility lines
Verify that installation surface has no hidden utility lines
before drilling or driving screws. the installation location
must have no obstructions to the awning being extended or
retracted.
Make sure that the electrical circuit that this item will be
Make sure that the electrical circuit that this item will be
connected to is disconnected before installation, adjustment,
or maintenance.
header installation
The header board must be 2” by 8” by 12’ and must be treated wood free from
defects. The header may also be painted before installation for aesthetic appeal.
Check to make sure that the mounting area is free from utility lines, especially
Check to make sure that the mounting area is free from utility lines, especially
electrical conduits. Detect and mark all studs in the mounting area.
Using a level to ensure that the header is perfectly level, have assistants hold the
Using a level to ensure that the header is perfectly level, have assistants hold the
header while the pilot holes are drilled through the header and into each stud 2”,
a total of 4” deep. Secure the header with hardware appropriate for the wall that
you will secure the header to (hardware not included). The header should be
secured evenly to studs in at least 8 places.