Desa (V)JM36 Manuale Utente

Pagina di 24
www.desatech.com
117541-01A
12
CHASE INSTALLATIONS
Instructions for chase installations are included 
with  the  chase  style  termination  chosen.  In  a 
multiple  chase  installation,  be  sure  to  provide 
adequate distance between terminations to prevent 
smoke spillage from one termination to another. 
We suggest that terminations be separated at least 
24", center to center and stacked at a vertical height 
difference of 18" (see Figure 16).
Note:
 If a decorative shroud is to be installed, 
contact the manufacturer for specifications.
VENTING INSTALLATION
Continued
10 FOOT RULE
All  flue  gas  outlet  chimney  terminations  must 
extend a minimum of 3 feet in height above the 
highest point where it passes through the roof and 
must be at least 2 feet above the highest point of 
the roof that is within a horizontal distance of 10 
feet (see Figure 17).
FINISHING THE FIREPLACE
Combustible materials, such as wallboard, gypsum 
board, sheet rock, drywall, plywood, etc. may make 
direct contact with sides and top around the fireplace 
face. It is important that combustible materials do 
not overlap the face itself. Brick, glass, tile or other 
noncombustible materials may overlap the front 
face provided they do not obstruct essential open-
ings like louvered slots or any other opening. When 
overlapping with a noncombustible facing material, 
use only noncombustible mortar or adhesive.
OPTIONAL GAS LINE 
INSTALLATION
Gas line hook up should be done by your supplier 
or a qualified service person.
Note
: Before you proceed, make sure your gas 
supply is turned off.
Use only a 1/2" black iron pipe and appropriate 
fittings. 
1.  Remove knockout indentation on refractory or 
firebrick wall located above the refractory hearth 
floor. The knockout indentation must be firmly 
tapped with any solid object such as a 1/2" dowel 
until it is released. Remove fragmented portions 
of refractory (see Figure 18, page 13).
2.  Remove gas line cover plate located on either 
side of fireplace and pull out insulation from gas 
line conduit sleeve. Save insulation for reuse. 
Replace screws.
3.  Run a 1/2" black iron gas line into the fireplace 
through the rear at gas line conduit sleeve (if 
using a raised platform, add height). Provide 
sufficient gas line into fireplace chamber for 
fitting connection (see Figure 19, page 13). 
Note
:  Secure  incoming  gas  line  to  wood 
framing to provide rigidity for threaded end.
4.  Repack insulation around gas line and into 
sleeve opening. Seal any gaps between gas line 
and refractory knockout hole with refractory ce-
ment or commercial furnace cement, Install the 
gas appliance or cap-off gas line if desired.
24" Min.
24" Min.
18" 
Min.
Typ.
Figure 16 - Multiple Chase Installation
10'
2' Min.
10'
3' Min.
2' Min.
3' Min.
Level of 
Flue Gas 
Outlet
Figure 17 - 10 Foot Rule