Bosch 00P ユーザーズマニュアル

ページ / 6
!
!
Wiring
 
Conduit
Up to 2-inch
in Diameter
Mounting
Bolts
!
Table of Contents
1    DESCRIPTION
2    UNPACKING
3    SERVICE
4    4    INSTALLATION
      4.1 Site Preparation
      4.2. Installation
      4.3  Mounting the AutoDome™ 
1  DESCRIPTION
The LTC 9316/00P units are 16 foot steel mounting poles for 
use with Unity® Domes, AutoDomes®, and the LTC 9320 
Series of Outdoor Fixed Domes. 
2  UNPACKING
Unpack carefully. This is mechanical equipment and should be
handled with care.
Check for the following:
• Packet Assembly for LTC 9316/00P:
    1 Bosch Adapter Plate.
    4 3/8 x 1-in Stainless Steel Hex Head Bolt.
    4 5/16-18 Stainless Steel Hex Nut.
    4 5/16 Stainless Steel Flat Wash.
    4 3/8 Stainless Steel Split Lockwasher.
    4 5/16 Stainless Steel Split Lockwasher.
    1 Wiring grommet
    1 Conduit plug
    1 Installation Instructions (This Manual).
• Steel Pole
If an item appears to have been damaged in shipment, replace it
properly in its carton and notify the shipper. If any items are
missing, notify your Bosch Security Systems Sales 
Representative or
Customer Service.
The shipping carton is the safest container in which the unit 
may be transported. Save it for possible future use. 
3  SERVICE
If the unit ever needs repair service, the customer should 
contact the nearest Bosch Security Systems Service Center for 
authorization to return and shipping instructions.
Service Centers
U.S.A.:  Phone: 800-366-2283 or 408-956-3895
              fax:      800-366-1329 or 408-956-3896
              e-mail: NationalServiceCenter@ca.slr.com
Canada: 514-738-2434
Europe, Middle East & Asia Pacifi c Regions:
              32-1-440-0711
For additional information, see www.boschsecuritysystems.com
Bosch Security Systems
2
2
2
3
3
3
4
10 October 2003
E
N
2
LTC9316/00P
Instruction Manual
Introduction
4  INSTALLATION
This installation should be made by qualifi ed service personnel and 
conform to the National Electrical Code and applicable local codes.
Please read these instructions carefully before proceeding, and
heed all cautions.
 1.    Select a suitable site for the LTC 9316/00P and prepare the pad site
         using a hole 36" x 36" x 36" deep.  The top of the concrete 
         foundation should be fl ush with the ground. 
NOTE:  Special attention must be paid to the size of the
              wiring conduit and its location within the concrete
              foundation and jig (if applicable). The Wiring
              Conduit can be up to 2" in diameter.  Use reducers 
              if necessary. Also, make sure that the Wiring 
              Conduit is in the center of the foundation and 
              Anchor Jig during installation (Figure 1). 
4.1    Site Preparation
Figure 1 Mounting Bolts & Wiring Conduit Location
CAUTION: Be sure that there are no underground electric or 
phone cables or gas or water lines in the area where the pole 
will be located.
  2.    To help reinforce the concrete foundation, place (12) 1/2" diameter
          x 32" long Reinforcement Bars (rebar) as shown in Figure 2. Use
          suitable preparation methods to place the rebar.