FIELD CONTROLS S2000 ユーザーズマニュアル

ページ / 16
SIMPLIFIED INSTALLATION INSTRUCTIONS
DETAILED INSTALLATION INSTRUCTIONS
1. Insulate the water reservoir. See figure 3.
2. Select the mounting location on the duct and tape
    on the mounting template.
3. Drill the (8) 1/8" mountings holes.
4. Cut out the humidifier opening in the duct.
5. Insert the humidifier into the opening and screw in
    place.
  6. Flush and connect the water line.
  7. Connect the drain line.
  8. Make 24 VAC electrical connections to achieve fan
      operation and interlock circuit.
  9. Install and connect the humidistat.
10. Plug power cord into a grounded dedicated 120 VAC, 20
      amp outlet for S2000 (240 VAC, 15 amp for S2020).
1. INSULATE WATER TANK RESERVOIR
2. LOCATION-LOCATION - Required Criteria
4. MOUNTING TEMPLATE
5. DRILL HOLES AND CUT OPENINGS
With insulation foil side down, remove adhesive backing. 
Align humidifier so that front side of unit meets long edge of 
insulation. Fold insulation up onto sides of humidifier and 
press  firmly.  Apply  5  continuous  strips  from  the  tape 
provided to seal the foil as shown. The tape will prevent the 
sharp duct edges from damaging the foil. Use additional foil 
tape to repair damage to the foil. The Insulation MUST be 
applied to the tank regardless of the mounting location.
DO NOT INSTALL this unit in an attic period. Do Not 
Install  this  unit  in  any  area  that  may  fall  below  35 
degrees F. Doing so will void your warranty! 
The steam 
humidifier can be installed in either the warm air supply or the 
cold air return ducts; however the preferred location would be 
in the warm air supply duct of the system. This humidifier does 
not require warm air to evaporate the water in order to provide 
humidity, but it will operate more efficiently in the warm air duct 
and  condensation is less likely to occur on the surrounding cold 
surfaces. Efficiency is lost in a return air duct location.
When selecting a location on the duct, be certain that there is 
enough room in the duct for the water reservoir. There should be 
at  least  five  (5)  inches  above  the  reservoir  and  the  reservoir 
should not occupy more than about 25 percent of the duct space. 
If this criteria can not be met, you should install the unit under 
the duct by means of the tank flange. See page 6.
If a suitable means of gravity draining the unit is not available 
or cannot be provided, the unit will work with the drain valve 
electrically disconnected. Call the Technical Support Hotline 
for Instructions.
It is highly recommended but not required that the 
use  of  Fiberglass  duct-board  with  this  product 
includes an anti-microbial treatment. 
Providing Adequate Structural Support for this unit is the 
responsibility  of  the  Installer.  It  is  recommended  to 
reinforce the cut openings with folded lengths of sheet-
metal  to  provide  rigidity  to  the  duct  opening.  Now  the 
screws must pass through 3 layers of metal when inserted. 
DO  NOT  install  this  unit  into  fiberglass  duct  without 
adequate  structural  support!  Both  models  weigh 
approximately 9 lbs. empty and 15lbs. full of water.
Two mounting templates are provided. Choose the correct 
template  for  your  mounting  method.  Tape  the  mounting 
template to the duct. The template must be leveled using the 
top of the cutout on the template. The template should be 
located so that the bottom of the reservoir cut-out is flush with 
the inside of the bottom of the duct for horizontal duct. Since 
most ducts are insulated this additional space, about one (1) 
inch, must be accounted for when determining the location 
for the bottom of the reservoir cut-out. If you are mounting it 
under the duct, make sure the duct is level.  
Use an electric drill, with grounded power cord, to drill eight 
(8) mounting holes, 1/8" diameter, in the duct. These can be 
drilled through the template at the locations indicated on the 
template.
A saber saw or tin snips can be used to cut out the water 
reservoir opening.
Insert and/or mount the Humidifier and secure it to the duct 
with the provided screws.
2
FIG. 4
MOUNTING TEMPLATE
MODEL S2000 & S2020
1.  TAPE TEMPLATE IN LEVEL POSITION.
2.  DRILL (8) HOLES FOR SHEET METAL SCREWS
     SHOWN ON TEMPLATE (DO NOT DRILL LARGER
     THAN 1/8" DIAMETER.
3.  CUT OUT SOLID LINE AREA AS MARKED.
4.  MOUNT HUMIDIFIER PER INSTRUCTIONS.
CUT ON LINE
CUT ON LINE
C
U
O
N
 L
IN
E
C
U
T O
N
 L
IN
E
P/N 094021B0037     
3. WEIGHT - Required Criteria
USE TAPE TO SEAL THE FOIL
TO THE FRONT MOUNTING PLATE
(3 PLACES-SIDES AND BOTTOM)
INSULATION 
(FOIL SIDE OUT)
USE TAPE TO SEAL
THE OUTSIDE EDGE 
OF THE FOIL
(2 PLACES)
FIG. 3