Thermo Products GDM1-80N ユーザーズマニュアル

ページ / 44
All installations and services must be performed by qualified service personnel. 
 
 
37 
 
Vent pipes should also be inspected for any signs of corrosion, deterioration, or leakage 
that may cause combustion by-products to infiltrate the home or indoor environment. 
 
If signs of corrosion, deterioration, or leakage are evident, the vent pipe must be 
replaced with a properly sized, agency-approved, vent pipe. 
 
E.  GASKETS/SEALING MATERIALS 
 
Inspect all visible gaskets for signs of degradation, especially any seals which were 
removed as part of the inspection.  Replace any suspect gaskets. 
 
F.  HEAT EXCHANGER 
 
Inspect for corrosion, pitting, warpage, deterioration, carbon build-up, and loose gaskets 
in the flue pipe, burner box, and accessible areas of the heat exchanger. 
 
G.  HOUSE AIR BLOWER 
 
Check and clean the blower wheel, housing, and compartment with a vacuum.  Check 
the motor nameplate and follow the motor manufacturers instructions for lubrication, if 
required. 
 
IMPORTANT:  Some motors are permanently lubricated and should not be oiled.  
See motor nameplate for specific instructions. 
 
 
H.  EXTENDED SHUTDOWN 
 
If this furnace is shut down or off for an extended period of time, several steps can be 
taken to help insure a smooth and reliable start. 
 
ON SHUT DOWN: 
 
1.  Close the gas supply shutoff valve(s).  
2.  Turn the furnace power switch “off” and disconnect electrical power to the unit. 
 
ON START-UP: 
 
1.   Have the heating system (and furnace) inspected and started by a qualified 
service person. 
2.  Set the room thermostat above room temperature. 
3.  Open all shutoff valves in the gas supply line. 
4.  Turn “on” the main power at the disconnecting switch and at the furnace power 
switch to start the inducer. 
5.  Follow the “BURNER OPERATION AND ADJUSTMENT” procedure in Section J.