Hearth & Home Technologies Bravo ユーザーズマニュアル

ページ / 61
Hearth & Home Technologies, Inc.  •  Bravo, Aztec  •  InD  •  703-900  Rev. N  •  8/06
9
A.    Vent Termination Minimum Clearances
Fire Risk.
Explosion Risk.
Maintain vent clearance to combustibles as 
specifi ed.
WARNING
•  Do not pack air space with insulation or 
other materials.
Failure to keep insulation or other materials 
away from vent pipe may cause fi re.
Roof Pitch 
H (Min.) Ft.
Flat to 6/12...........................................................1.0*
Over 6/12 to 7/12 .................................................1.25*
Over 7/12 to 8/12 .................................................1.5*
Over 8/12 to 9/12 .................................................2.0*
Over 9/12 to 10/12 ...............................................2.5
Over 10/12 to 11/12 .............................................3.25
Over 11/12 to 12/12 .............................................4.0
Over 12/12 to 14/12 .............................................5.0
Over 14/12 to 16/12 .............................................6.0
Over 16/12 to 18/12 .............................................7.0
Over 18/12 to 20/12 .............................................7.5
Over 20/12 to 21/12 .............................................8.0
Figure 4.1
Figure  4.2     Minimum Height from Roof to 
                        Lowest Discharge Opening
Termination Locations
4
Measure horizontal clearances from this surface.
Measure vertical clearances from this surface.
Figure 4.3     Multiple Vertical Termination
Figure 4.2 specifi es minimum vent heights for various 
pitched roofs.
(See Figure 4.4 for specifi c clearances)
* 3 foot minimum in snow regions
H (MIN.) - MINIMUM HEIGHT FROM ROOF
TO LOWEST DISCHARGE OPENING
Gas Termination
Wood & Fuel Oil Termination
A
6 in.
20 in.
20 IN.
(MINIMUM) TO
PERPENDICULAR
WALL
(GAS ON LY)
GAS
TERMIN ATION
GAS, WOOD OR FUEL
OIL TERMINATION