IBM 8688 ユーザーズマニュアル

ページ / 262
v
   
RXE-100
 
Side
 
A
 
 
Side
 
B
 
Test
 
This
 
test
 
verifies
 
the
 
quality
 
of
 
the
 
connection
 
from
 
the
 
RXE-100
 
Side
 
A
 
to
 
the
 
RXE-100
 
Side
 
B.
 
v
   
RXE-100
 
Side
 
B
 
 
Side
 
A
 
Test
 
This
 
test
 
verifies
 
the
 
quality
 
of
 
the
 
connection
 
from
 
the
 
RXE-100
 
Side
 
B
 
to
 
the
 
RXE-100
 
Side
 
A.
 
v
   
RXE-100
 
Side
 
B
 
Port
 
Test
 
This
 
test
 
verifies
 
the
 
quality
 
of
 
the
 
connection
 
from
 
the
 
RXE-100
 
Side
 
B
 
Port
 
connector
 
to
 
the
 
RXE
 
Expansion
 
Port.
Advanced
 
System
 
Management
 
Test
 
The
 
Advanced
 
System
 
Management
 
(ASM)
 
Test
 
consists
 
of
 
the
 
following
 
sub-tests:
 
v
   
ASM/ISMP
 
I2C
 
Bus
 
Test
 
This
 
test
 
queries
 
the
 
status
 
of
 
the
 
I2C
 
subsystem
 
within
 
the
 
x450
 
node.
 
It
 
reports
 
back
 
on
 
any
 
internal
 
integrated
 
circuit
 
(I2C)
 
radials
 
that
 
either
 
are
 
untested
 
or
 
tested
 
bad.
 
v
   
ASM
 
Built-In
 
Self
 
Test
 
(BIST)
 
This
 
test
 
queries
 
the
 
ASM
 
for
 
the
 
status
 
of
 
its
 
last-run
 
BIST.
 
Non-disruptive
 
portions
 
of
 
BIST
 
are
 
run
 
periodically
 
on
 
the
 
ASM
 
adapter.
 
Failing
 
BIST
 
results
 
will
 
be
 
reported
 
so
 
that
 
you
 
can
 
determine
 
which,
 
if
 
any,
 
of
 
the
 
major
 
subsystems
 
of
 
the
 
ASM
 
adapter
 
are
 
malfunctioning.
 
v
   
ASM
 
Restart
 
Test
 
Use
 
this
 
test
 
to
 
restart
 
the
 
ASM
 
adapter
 
without
 
disconnecting
 
ac
 
power
 
from
 
the
 
xSeries
 
450
 
server.
 
v
   
RXE
 
I2C
 
Bus
 
Test
 
This
 
test
 
queries
 
the
 
status
 
of
 
the
 
I2C
 
subsystem
 
within
 
attached
 
RXE-100
 
units.
 
It
 
reports
 
back
 
on
 
any
 
I2C
 
radials
 
that
 
are
 
either
 
untested
 
or
 
tested
 
bad.
 
Note:
  
To
 
run
 
this
 
test,
 
the
 
ASM
 
adapter
 
must
 
be
 
cabled
 
correctly
 
to
 
the
 
RXE-100
 
unit
 
using
 
the
 
RS-485
 
bus
 
and
 
appropriate
 
Category
 
3
 
and
 
Category
 
5
 
cables
 
with
 
proper
 
termination.
 
v
   
RXE
 
ISMP
 
Self
 
Test
 
This
 
test
 
queries
 
the
 
ISMP
 
controllers
 
of
 
attached
 
RXE-100
 
units
 
for
 
the
 
last
 
BIST
 
status.
 
Failing
 
RXE-100
 
BIST
 
results
 
will
 
be
 
reported
 
so
 
that
 
you
 
can
 
determine
 
if
 
the
 
ISMP
 
subsystem
 
is
 
malfunctioning
 
due
 
to
 
microcontroller
 
problems.
 
Note:
  
To
 
run
 
this
 
test,
 
the
 
ASM
 
adapter
 
must
 
be
 
cabled
 
correctly
 
to
 
the
 
RXE-100
 
unit
 
using
 
the
 
RS-485
 
bus
 
and
 
appropriate
 
Category
 
3
 
and
 
Category
 
5
 
cables
 
with
 
proper
 
termination.
  
62
 
IBM
 
xSeries
 
450
 
Type
 
8688:
 
Hardware
 
Maintenance
 
Manual
 
and
 
Troubleshooting
 
Guide