Mitsubishi Electronics A1SJ71AT23BQ ユーザーズマニュアル

ページ / 158
5
 - 15
5.5 Self-diagnostic Test
5.5.1 Self-loopback test
5
PREPARATORY PROCEDURES BEFORE 
OPERATION
1) When three LEDs (F.LOOP, R.LOOP, and TIME) are turned ON
 • A forward loop cable is disconnected
 • The send side and receive side of forward loop are not connected by a 
cable
 • The send side of a forward loop and the send side of a reverse loop and 
the receive side of a forward loop and the receive side of a reverse loop 
are connected
2) When three LEDs (F.LOOP, R.LOOP, and DATA) are turned ON
 • A reverse loop cable is disconnected
 • The send side and receive side of a reverse loop are not connected by a 
cable
3) When ERROR LED other than above 1) and 2) is turned ON
 • Hardware failure
 • A cable is disconnected during the test
 • A cable is broken during the test