Mitsubishi Electronics A1SJ71AT23BQ ユーザーズマニュアル

ページ / 158
5
 - 17
5.5 Self-diagnostic Test
5.5.2 Station-to-station test
5
PREPARATORY PROCEDURES BEFORE 
OPERATION
(c) MELSECNET/B(A1SJ71AT23BQ)
The connection of the MELSECNET/B(A1SJ71AT23BQ) is as follows:
(2) Switch setting
Set the RUN/STOP switch of the CPU module to STOP, and set the DIP switch on the 
front of the link module as follows:
(
(3) Execution of test
Figure 5.20 MELSECNET/B(A1SJ71AT23BQ)
Table 5.6 Switch setting
Item
No. (Set value)
Description
Executing station No. n
Station No. setting 
switch
01
Station No.1
Mode setting switch
5
Station-to-station test (Executing station)
Other station No. n + 1
Station No. setting 
switch
02
Station No.2
Mode setting switch
6
Station-to-station test (Other station)
Figure 5.21 Execution of test
SDA/RDA
SDB/RDB
SG(L)
FG
SDA/RDA
SDB/RDB
SG(L)
FG
Shielded twisted
pair cable
Shield
Shield
Data flow
Executing station No.n
Other station No.n+1
SDA/SDB of executing station    RDA/RDB of other station
RDA/RDB of executing station    SDA/SDB of other station
Terminating resistor
(110    1/2W)
Terminating resistor
(110    1/2W)
Start
End
Judge the test result.
Turn ON from OFF the power supply of the other 
station or reset the CPU module.
Turning ON from OFF the power supply of the 
executing station No.n or resetting the CPU module 
leads to start the test.