SMC Networks Barricade ユーザーズマニュアル

ページ / 40
-9- 
 
Figure 2-6 Setup of WAN and Printer connections for this product. 
4.  Power on:   
Connect the power cord to power inlet and turn the power switch on.  The Barricade 
will automatically enter the self-test phase. When it is in this phase, the indicator M1 
will light up for about 5 seconds, and then M1 will flash 3 times to indicate that the 
self-test operation is complete. Finally, the M1 will continuously flash once per second 
to indicate that this product is operating normally.