Emerson 480V ユーザーズマニュアル

ページ / 112
Battery Installation
25
3.6
Alber Monitoring System—Optional
The Liebert matching battery cabinet allows installing an optional Alber Battery monitoring system 
in the cabinet. The Alber Battery Monitoring by Liebert continuously checks all critical battery 
parameters, such as cell voltage, overall string voltage, current and temperature. Automatic periodic 
tests of internal resistance of each battery will verify the battery’s operating integrity. Additional 
capabilities include automatic internal DC resistance tests and trend analysis providing the ability to 
analyze performance and aid in troubleshooting.
The Alber monitoring system is installed inside the battery cabinet (see Figure 10). The monitoring 
system requires approximately 0.5A, single-phase 480V.
This power can come from the output terminals of the UPS, a distribution panel, or another 
UPS-protected source. This power is to be field supplied. See Figure 30 for wiring location.
For details about operating the Alber system, see the Alber Monitoring System manual.
NOTE
This power must be UPS protected.