Enterasys Networks VH-8G-L3 ユーザーズマニュアル

ページ / 41
 
9033705-01 
20
 
2. Installation 
Inspecting Your Shipment 
Open the shipping carton of the Switch and carefully unpack 
its contents. The carton should contain the following items: 
•  One VH-8G-L3 8-port Gigabit Ethernet Layer 3 
Switch. 
•  Mounting kit: 2 mounting brackets and screws. 
•  Four rubber feet with adhesive backing. 
•  One AC power cord. 
•  One ESD wrist strap. 
•  Product Documentation. 
If any item is found missing or damaged, please contact your 
local Enterasys sales agent for replacement. 
Installation 
Use the following guidelines when choosing a place to install 
the Switch: 
•  The surface must support at least 3 kg.  
•  The power outlet should be within 1.82 meters (6 
feet) of the device. 
•  Visually inspect the power cord and see that it is 
secured to the AC power connector. 
•  Make sure that there is proper heat dissipation from 
and adequate ventilation around the Switch. Do not 
place heavy objects on the Switch.