Lucent Technologies lucent ユーザーズマニュアル

ページ / 2392
DEFINITY Enterprise Communications Server  Release 6
Maintenance for R6vs/si  
555-230-127   
Issue 1
August 1997
Maintenance Object Repair Procedures 
Page 10-1298
TBRI-PT (TN2185 ISDN Trunk-Side BRI Port) 
10
Layer 3 Query Test (#1243)
This test is nondestructive.
This test is used to check the application layer communications across the 
in-service ISDN D-Channel. The test passes if a status enquiry message is 
successfully sent, fails if the signaling link is down, and aborts if a query is 
already running or there is an internal error.
4
FAIL
Received a status of Level 1 Pending Activation, the NT1 has a loss of 
power indicating a problem with the NT1.
1. Follow the manufacturer-recommended repair procedures for the NT1.
2. Execute the 
test port PCSSpp
 command and review the results of the 
Level 1 Status Inquiry test to verify the repair.
PASS
This test indicates that Level 1 is activated or that software has taken the 
port out of service.
Table 10-449.
TEST #1243 Layer 3 Query 
Error 
Code
Test 
Result
Description/ Recommendation
1019
ABORT
Test is already running.
1113
ABORT
The signaling link is down.
1. Use the 
test port PCSSpp long
 command to clear any errors which 
prevent establishment of the signaling link.
2. Examine the results of Test #626, which is executed with the 
command. If this test aborts or fails, follow the repair procedure for the 
Signaling Link Status Test.
3. Escalate problem if BRI Layer 3 Query Test continues to abort.
1139
ABORT
The Packet Bus in the port network is out-of-service.
1. Follow the repair procedures for the Packet Bus.
2. After completing Step 1, execute the 
test port long PCSSpp
 
command and review the results of the BRI Port Local LAN 
Looparound Test to verify the repair.
Continued on next page
Table 10-448.
TEST #1242 Level 1 Status Inquiry  — 
Continued
Error 
Code
Test 
Result
Description/ Recommendation
Continued on next page