Lucent Technologies lucent ユーザーズマニュアル

ページ / 2392
DEFINITY Enterprise Communications Server  Release 6
Maintenance for R6vs/si  
555-230-127   
Issue 1
August 1997
Maintenance Object Repair Procedures 
Page 10-1299
TBRI-PT (TN2185 ISDN Trunk-Side BRI Port) 
10
Slip Query Test (#1244)
This test is nondestructive.
Slips occur when the transmitter and receiver are not running at precisely the 
same clock rate. The Slip Alarm Inquiry Test polls the total number of slips that 
have occurred on a link.
1141
ABORT
The PKT-CTRL is out-of-service.
1. Consult the repair procedure for PKT-CTRL.
2. If Step 1 does not resolve the problem, escalate to the next tier.
1144
ABORT
The PPN Packet Bus is out-of-service.
1. Follow the repair procedures for the Packet Bus in the PPN.
2. After completing Step 1, execute the 
test port long PCSSpp
 
command and review the results of the BRI Port Local LAN 
Looparound Test to verify the repair.
1187
ABORT
The circuit pack or port may have been busied out by a technician.
1. Look in the Error Log for Error Type 18 (busied out ) for TBRI-BD or 
TBRI-PT.
a. If this error type is present for TBRI-PT, then release the port with 
the 
release port PCSSpp
 command and run the test again.
b. If the error is present for both TBRI-BD and TBRI-PT, then release 
the circuit pack with the 
release board PPCSS
 command and run 
the test again.
NOTE:
When you release the circuit pack, you release all ports associated 
with it. If certain ports still need to be busied out, use the 
release 
port PCSSpp
 command to busy them out.
2. Make sure the terminal is connected.
3. Retry the command at 1-minute intervals a maximum of 5 times.
2012
ABORT
Internal system error
2100
ABORT
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
PASS
The switch has successfully sent a Status Enquiry message.
Table 10-449.
TEST #1243 Layer 3 Query  — 
Continued
Error 
Code
Test 
Result
Description/ Recommendation
Continued on next page