Reliability Systems: A Maintenance Aid 
Page 6-21
Repair Procedures for High and Critical Reliability 
6
cause a PEI. If the refresh or system interchange are unsuccessful, then 
use the SPE select switches to hard select the Standby SPE (this will result 
in a COLD 2 restart of the system).
4. If the 
upgrade software
 (
reset system interchange
) command is 
successful, an SPE-interchange results in the new Active SPE performing 
a COLD 2 (HOT) restart. Follow the “Circuit Pack Replacement Procedure” 
described later. If the 
upgrade software
 command failed, determine why 
the failure occurred, resolve the problem, and repeat this entire 
procedure.
Handling DUPINT Alarms in the Active SPE
Check for the existence of DUPINT alarms against the Active SPE Duplication 
Interface circuit pack. If there are Active SPE DUPINT alarms, inform the 
customer that a reboot of the system may be required and determine a time at 
which a reboot may be done. At that time, complete the following steps:
1. Make sure that the translation card in the Active SPE has the most current 
translations. If it does not, issue 
save translations spe-active
 to put the 
most current translations on it.
2. Exchange the translation cards in the Active SPE and Standby SPE so that 
the Standby SPE contains the card with the most current translations.
3. Throw the SPE Select Switches on the TN772 Duplication Interface circuit 
packs to force an SPE-interchange so that the current Standby SPE 
becomes the new Active SPE. If SPE B is currently the Standby SPE, throw 
both SPE Select Switches to the right. If SPE A is currently the Standby 
SPE, throw both SPE Select Switches to the left.
If the Duplication Interface circuit pack actually severed the Memory 
Shadowing Link resulting in corruption of Standby SPE Memory, the 
SPE-interchange results in the new Active SPE performing a Reboot. 
However, if the defect in the Duplication Interface circuit pack did not 
sever the Memory Shadowing Link, the SPE-interchange results in the new 
Active SPE performing a Warm Start instead.
4. After the SPE-interchange is complete, log into the terminal. Follow the 
“Circuit Pack Replacement Procedure” described later 
for each circuit 
pack to be replaced in the new Standby SPE.
Upgrading SPE Circuit Packs
Determine which SPE is the Standby SPE by issuing the 
status system
 
command. Look at the SPE and MODE fields in the upper left corner of the form. 
The Active SPE; it is labeled as “active.” The other SPE is the Standby SPE and is 
labeled as either “standby,” “maint,” or “down.”
Follow the 
 described later 
for each 
Standby SPE circuit pack to be upgraded
.