Lucent Technologies lucent ユーザーズマニュアル
DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
Maintenance for R6vs/si
555-230-127
Issue 1
August 1997
Maintenance Commands and Trouble-Clearing Aids
Page 8-373
test pkt
8
Feature Interactions
The reset packet-control test (#586) does not run on the active packet-control.
This test is part of the standby packet-control test sequence, illustrated in the
screen output section below.
This test is part of the standby packet-control test sequence, illustrated in the
screen output section below.
Output
The following example is the screen output for the
test packet-control 1B long
command. Note that carrier B is the active carrier in this example.
Field descriptions
test pkt
The test pkt runs a series of tests on the Packet bus of the specified PPN or EPN.
Port
Port address (cabinet-carrier-slot-circuit)
Maintenance
Name
The name of maintenance object.
Alt. Name
Not applicable
Test No.
The test number run on the packet-control.
Result
Test result: Pass, Abort, Fail, No Board, Disabled, Extra Bd.
Error Code
Numeric code explaining why the release failed or aborted. Refer
to the detailed list of the codes by test number for each MO.
to the detailed list of the codes by test number for each MO.
test packet-control 1B l
TEST RESULTS
Port Maintenance Name Alt. Name Test No. Result Error Code
01B PKT-CTRL 583 PASS
01B PKT-CTRL 584 PASS
01B PKT-CTRL 585 PASS
Port Maintenance Name Alt. Name Test No. Result Error Code
01B PKT-CTRL 583 PASS
01B PKT-CTRL 584 PASS
01B PKT-CTRL 585 PASS
Command successfully completed