Lucent Technologies lucent ユーザーズマニュアル

ページ / 2392
DEFINITY Enterprise Communications Server  Release 6
Maintenance for R6vs/si  
555-230-127   
Issue 1
August 1997
Maintenance Commands and Trouble-Clearing Aids 
Page 8-374
test pkt 
8
!
WARNING:
Since the “clear long” options clear all counters if tests pass, it is possible 
for firmware counters to be cleared even when a problem exists. In some 
cases customer service might degrade since calls may be routed over 
defective equipment.
Output
The following example is the output for the test pkt port-network 1 command. The 
responses display on a test-by-test basis with one line of data for each test result.
1.
If no alarms are registered against the maintenance object then the test sequence is run only once. The
 long clear
 
option forces a clear of all alarms if no errors are encountered during testing. The 
short clear
 option only clears 
alarms pertinent to tests in the short sequence. SEE WARNING BELOW.
2.
Refer to the Report Scheduler and System Printer feature specification for more details.
Action/Object
Qualifier
Qualifier Description
Permissions
Defaults
Feature
Interactions
test pkt 
port-network
pn 
number
short
long
repeat 
number
clear
schedule
The Packet bus to be tested: 
nn
 (1-3)
Option for a brief series of 
nondestructive diagnostic tests.
Option for a longer, more 
comprehensive series of both 
destructive and nondestructive 
diagnostic tests.
How many times each test in the 
sequence is repeated (1-100)
This option causes the test sequence 
(short or long) to repeat until the alarm 
(if any) is cleared or a single test in the 
sequence fails.
1
Command is validated and then a 
scheduling form displays to schedule 
execution of the command. The 
command is then placed in the 
command queue and is executed at 
the specified time. The information 
displayed by the command is sent to 
the system printer instead of the 
screen.
2
Examples:
test pkt port-network 1 l 
test pkt port-network 2 sh r 2
test pkt port-network 2 sh schedule
test pkt port-network 1 l r 25
test pkt port-network 2
test pkt port-network 1 c
init
inads
craft
Test 
Sequence 
= short; 
Repeat = 
1
none