Lucent Technologies lucent ユーザーズマニュアル

ページ / 2392
DEFINITY Enterprise Communications Server  Release 6
Maintenance for R6vs/si  
555-230-127   
Issue 1
August 1997
Maintenance Commands and Trouble-Clearing Aids 
Page 8-386
test signaling-group 
8
test signaling-group
This command validates that the specified signaling group is administered and 
runs a series of diagnostic tests that return results of the test along with possible 
error codes. A signaling group is a collection of B-channels signaled for by a 
designated single D-channel or set of D-channels over an ISDN-PRI.
!
WARNING:
Since the “clear long” options clear all counters if tests pass, it is possible 
for firmware counters to be cleared even when a problem exists. In some 
cases customer service might degrade since calls may be routed over 
defective equipment.
1.
If no alarms are registered against the maintenance object then the test sequence is run only once. The
 long clear
 
option forces a clear of all alarms if no errors are encountered during testing. The 
short clear
 option only clears 
alarms pertinent to tests in the short sequence. SEE WARNING BELOW.
2.
Refer to the Report Scheduler and System Printer feature specification for more details.
Action/Object
Qualifier
Qualifier Description
Permissions
Defaults
Feature
Interactions
test 
signaling-group
group 
identifier
short
long
repeat 
number
clear
schedule
The station extension (must 
conform to dial-plan)
Option for a brief series of 
nondestructive diagnostic tests.
Option for a longer, more 
comprehensive series of both 
destructive and nondestructive 
diagnostic tests.
How many times each test in the 
sequence is repeated (1-100)
This option causes the test 
sequence (short or long) to repeat 
until the alarm (if any) is cleared or 
a single test in the sequence fails.
1
Command is validated and then a 
scheduling form displays to 
schedule execution of the 
command. The command is then 
placed in the command queue and 
is executed at the specified time. 
The information displayed by the 
command is sent to the system 
printer instead of the screen.
2
Examples:
test signaling-group 1 
test signaling-group 1 repeat 10
test signaling-group 2 short
test signaling-group 4 long
test signaling-group 4 long clear
test signaling-group 2 schedule
init
inads
craft
Test 
Sequence
 = short; 
Repeat = 
1
See below