Lucent Technologies lucent ユーザーズマニュアル

ページ / 2392
DEFINITY Enterprise Communications Server  Release 6
Maintenance for R6vs/si  
555-230-127   
Issue 1
August 1997
Maintenance Commands and Trouble-Clearing Aids 
Page 8-388
test sp-link 
8
Output
The following output example is for the 
test sp-link
 command. The responses 
display on a test-by-test basis with one line of data for each test result.
1.
Refer to the Report Scheduler and System Printer feature specification for more details.
Action/Object
Qualifier
Qualifier Description
Permissions
Defaults
Feature
Interactions
test sp-link
short
long
schedule
Option for a brief series of 
nondestructive diagnostic tests.
Option for a longer, more 
comprehensive series of both 
destructive and nondestructive 
diagnostic tests.
Command is validated and then a 
scheduling form displays to 
schedule execution of the 
command. The command is then 
placed in the command queue and 
is executed at the specified time. 
The information displayed by the 
command is sent to the system 
printer instead of the screen.
1
Examples:
test sp-link 
test sp-link sh
test sp-link l
test sp-link schedule
test sp-link sh sch
init
inads
craft
short
none
 
 test sp-link                                 SPE A
                              TEST RESULTS
   Port    Maintenance Name  Alt. Name Test No. Result       Error Code
           SYS-PRNT                    215      PASS
           SYS-PRNT                    213      PASS
 Command Successfully Completed