Lucent Technologies lucent ユーザーズマニュアル

ページ / 2392
DEFINITY Enterprise Communications Server  Release 6
Maintenance for R6vs/si  
555-230-127   
Issue 1
August 1997
Packet Bus Fault Isolation and Correction 
Page 9-24
Packet Bus Fault Correction 
9
Packet Bus Fault Correction
Using and Interpreting Results from the Status 
System Command
The 
status system 
command can be issued to retrieve information about the 
Packet Bus. This command is described fully in the "Status Commands" section 
in 
.
The 
status system
 command provides the service state, alarm status, and (if the 
Maintenance/Test Packet Bus port is activated) the number of faulty and open 
leads. This information can be used to determine the urgency of the repair. In 
general, a service state of ‘‘out’’ indicates extreme urgency, while a service state 
of ‘‘reconfig’’ indicates moderate urgency.
!
CAUTION:
Ultimately, the urgency of a repair is determined by the customer’s 
requirements. A customer who uses ISDN-BRI for station sets probably 
considers a Packet Bus failure critical. However, a customer with only a 
small percentage of ISDN-BRI service may consider even an uncorrectable 
Packet Bus fault to be of minor importance and may prefer to delay 
performing repairs, due to their destructive nature.
NOTE:
If maintenance is actively running on the Packet Bus at the time the 
status 
system
 command is issued, the data reported for the Packet Bus may be 
inconsistent. The reason is that this data is updated by the maintenance 
tests that are running. If the data seems inconsistent, enter the command 
again.
If test results or the results of the 
status system
 command indicate that there are 
24 faults on the Packet Bus, the problem is probably caused by faulty cables 
between carriers, or by defective bus terminators. However, before proceeding, 
make sure that the report is not being falsely given by the Maintenance/Test 
Packet Bus port. Accordingly, look for an M/T-PKT error in the error log. Then test 
the Maintenance/Test Packet Bus port by entering the 
test port 
command. Refer 
to the 
 section earlier in this chapter 
if any problems are suspected.
If the carrier into which a TN771 Maintenance/Test circuit pack is installed does 
not have a -5 volt power supply, the Maintenance/Test Packet Bus port reports 
24 open leads on the Packet Bus (via the 
status system
 command and via Test 
#572 of the PKT-BUS test sequence). No failure of the TN771 is indicated in this 
case because the TN771 is not defective. Refer to CARR-POW maintenance in 
, and ensure that a -5 volt 
power supply is available.