Lucent Technologies lucent ユーザーズマニュアル
DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
Maintenance for R6vs/si
555-230-127
Issue 1
August 1997
Maintenance Object Repair Procedures
Page 10-191
BRI-SET, ASAI-ADJ, BRI-DAT
10
System Technician-Demanded Tests:
Descriptions and Error Codes
Descriptions and Error Codes
When inspecting errors in the system and deciding which ones to address,
always investigate errors associated with the circuit pack and port first. Clearing
these error codes first may also clear errors generated against the endpoint.
When all circuit pack and port errors have been cleared, and errors still exist
against the endpoint, always investigate errors in the order they are presented in
the table below. By clearing error codes associated with the
always investigate errors associated with the circuit pack and port first. Clearing
these error codes first may also clear errors generated against the endpoint.
When all circuit pack and port errors have been cleared, and errors still exist
against the endpoint, always investigate errors in the order they are presented in
the table below. By clearing error codes associated with the
Signaling Link
Status Test,
for example, you may also clear errors generated from other tests in
the testing sequence.
65
Bearer Service
Not Implemented
Not Implemented
Requested service not implemented in switch or
endpoint.
endpoint.
69
Requested
Facility Not
Implemented
Facility Not
Implemented
Requested service not supported in switch or
endpoint.
endpoint.
1. Consult switch and endpoint documentation to
determine service support.
2. If Step 1 does not resolve the problem, escalate
to the next tier.
ADJUNCT/SWITCH ERROR CONDITIONS
81
Invalid CRV
An invalid CRV was sent by the adjunct.
1. This may indicate a CRV inconsistency between
the switch and the adjunct. See the CallVisor
protocol reference manual.
protocol reference manual.
2. If step 1 does not resolve the problem, escalate
to the next tier.
Table 10-68.
System Technician-Demanded Tests: BRI-SET
Order of Investigation
Short Test
Sequence
Long Test
Sequence
D/ND
1
Signaling Link Status Test (#626)
X
X
ND
BRI XID Test (#628)
X
X
ND
BRI Layer 3 Query (#629)
X (a)
X (a)
ND
Continued on next page
Table 10-67.
ISDN-BRI Cause Values —
Continued
Code
Explanation
Recommendation
Continued on next page