Lucent Technologies lucent ユーザーズマニュアル

ページ / 2392
DEFINITY Enterprise Communications Server  Release 6
Maintenance for R6vs/si  
555-230-127   
Issue 1
August 1997
Maintenance Object Repair Procedures 
Page 10-192
BRI-SET, ASAI-ADJ, BRI-DAT 
10
Note:
a. Will execute the 
test port long PCSSpp
 command, and review the results 
of the BRI Port Local LAN Loop Around Test to verify the repair.
Signaling Link Status Test (#626)
This test determines the current status of the signaling link. This test passes if the 
link is "bound" to an endpoint and fails if the link is "not bound."
The definition of the term "bound" for a link depends upon the type of endpoint 
and may depend on the successful completion of procedures at both Layers 2 
and 3 of the protocol. The definition of "bound" for each type of endpoint is as 
follows:
BRI endpoints administered for MIM (management information 
messages) initialization (multipoint):
 
NOTE:
An MIM is a level 3 message that conveys management and 
maintenance information between a communications system and a 
BRI terminal.
For endpoints of this type, the signaling link is "bound" when the link is 
connected at Layer 2 and the link has been associated with an endpoint, 
[that is, the endpoint has completed SPID initialization (L3 established)].
ASAI adjuncts and BRI endpoints not administered for MIM 
initialization (point-to-point):
 
For endpoints of this type, the signaling link is "bound" when the link is 
connected at Layer 2 (L2 established).
1.
D = Destructive, ND = Non-destructive
BRI Remote Loop Back (#627)
X (a)
ND
BRI Set Audits (#630)
X (a)
X (a)
ND
BRI Vendor ID Test (#631)
X (a)
ND
BRI Model/Vintage ID Test (#632)
X (a)
ND
Table 10-68.
System Technician-Demanded Tests: BRI-SET — 
Continued
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
D/ND
1
Continued on next page