Lucent Technologies lucent ユーザーズマニュアル

ページ / 2392
DEFINITY Enterprise Communications Server  Release 6
Maintenance for R6vs/si  
555-230-127   
Issue 1
August 1997
Maintenance Object Repair Procedures 
Page 10-321
CO-TRK (CO Trunk) 
10
Port Audit Update Test (#36)
This test sends updates of the CO port translation for all ports on the circuit pack 
that have been translated. The update is non-disruptive and guards against 
possible corruption of translation data contained on the circuit pack. No 
response message is expected from the circuit pack once it receives translation 
updates. The port translation data includes: ground or loop start trunk, tone or 
rotary dialing trunk, rotary dialing inter-digit timing, network balance R/RC, and 
disconnect timing.
0
NO 
BOARD
The test could not relate the internal ID to the port (no board).
1. Check to ensure that the board translations are correct. Translate the 
board, if necessary.
2. Issue the 
busyout board
 command.
3. Issue the 
reset board
 command.
4. Issue the 
release busy board
 command.
5. Issue the 
test board
 command. This should re-establish the linkage 
between the internal ID and the port.
Table 10-105.
TEST #36 Port Audit Update Test 
Error 
Code
Test 
Result
Description/ Recommendation
ABORT
Could not allocate the necessary system resources to run this test.
1. Retry the command at one-minute intervals a maximum of five times.
2. If the test continues to abort, escalate the problem.
Continued on next page
Table 10-104.
TEST #33 Loop Around and 
Conference Circuit Test  — 
Continued
Error 
Code
Test 
Result
Description/ Recommendation
Continued on next page