Zenoah EXZ2401S ユーザーズマニュアル

ページ / 112
22
6. Set up (EX2-BC only)
English
6. Set up (EX-LRT only)
EX2-BC
SE2
EX2-BC
SE3
EX2-BC
SE1
EX-LRT
SE1
■ INSTALLING DEBRIS GUARD
• Put the debris guard on the gear box, attach it with
the 2 screws and hardware provided. (SE1)
■ INSTALLING CUTTING HEAD (SE2)
1. While locking the gear shaft, by inserting the
supplied tool into the upper holder on the gear box,
loosen and remove the hexagon nut(left-handed)
2. Then screw in the cutting head to the gear shaft over
the holders. Hand-tighten it securely.
■ BALANCE UNIT
1. Put on strap and attach unit to strap.
2. Slide clamp up or down until unit balances with head
just touching on the ground. (SE3)
■ ATTACHING THE TRIMMING MECHANISM (SE1)
1. Remove the screw screwed into the end of the
trimming mechanism.
2. Insert the end of the trimming mechanism into the
main pipe.
3. Line up the hole on the end of the trimming
mechanism into which the screw is to be inserted
with the hole on the main pipe, and screw the screw
firmly in.
4. Using a wrench, screw in the bolt provided to fix the
trimming mechanism into place. 
(1) Main pipe
(2) Trimming mechanism
(3) Screw hole
(4) Screw
(5) Fastening bolt
■ BALANCE UNIT
1. Put on strap and attach unit to strap.
2. Depending on the working posture, slide clamp up or
down until unit balances and the strap fits your body.