Mitsubishi Electronics E60 ユーザーズマニュアル
9.
MACHINE ERROR COMPENSATION
9.1 Function
Outline
II - 289
(SETUP PARAM 5. 1/15)
# Item
Details
Setting
range
4000
(PR)
Pinc Machine
error
offset increment
method
method
Specify whether to use the incremental
amount method or absolute amount method
when setting the machine error
compensation data.
amount method or absolute amount method
when setting the machine error
compensation data.
0: Absolute volume
method
1: Incremental
volume method
<1st axis>
# Item
Details
Setting
range
4001
cmpax
Basic axis
Specify the basic axis address for machine
error compensation.
1) For pitch error compensation‚ set the
error compensation.
1) For pitch error compensation‚ set the
name of the axis to be compensated.
2) For relative position compensation‚ set
the name of the axis to be the base axis.
X, Y, Z, U, V, W, A, B,
or C axis address
or C axis address
4002 drcax
Compensation
axis
axis
Set the compensation axis address for
machine error compensation.
1) For pitch error compensation‚ set the
machine error compensation.
1) For pitch error compensation‚ set the
same axis name as #4001 cmpax.
2) For relative position compensation‚ set
the name of the axis to be actually
compensated.
compensated.
X, Y, Z, U, V, W, A, B,
or C axis address
or C axis address
4003 rdvno
Division
point
number at
reference point
position
reference point
position
Set the compensation data No.
corresponding to the reference point
position. The reference point is actually the
base‚ so there is no compensation No. Set
the number that is decremented by 1.
corresponding to the reference point
position. The reference point is actually the
base‚ so there is no compensation No. Set
the number that is decremented by 1.
4101 to 5124
4004 mdvno Division
point
number at the
most negative
side
most negative
side
Set the compensation data No. that is on
the farthest negative side.
the farthest negative side.
4101 to 5124
4005 pdvno
Division
point
number at the
most positive side
most positive side
Set the compensation data No. that is on
the farthest positive side.
the farthest positive side.
4101 to 5124
4006 sc
Compensation
scale factor
scale factor
Set the compensation amount’s scale.
0 to 99
4007
spcdv
Division interval
Set the interval to divide the basic axis.
Each compensation data will be the
compensation amount for each of these
intervals.
Each compensation data will be the
compensation amount for each of these
intervals.
1 to 9999999