At  the  time  of  removal  of  an  existing  boiler,  the  following  steps 
shall  be  followed  with  each  appliance  remaining  connected  to 
the common venting system placed in operation, while the other 
appliances  remaining  connected  to  the  common  venting  system 
are not in operation.
Seal any unused openings in the common venting system.
Visually inspect the venting system for proper size and horizontal 
pitch  and  determine  there  is  no  blockage  or  restriction,  leakage, 
corrosion  and  other  deficiencies  which  could  cause  an  unsafe 
condition.
Insofar as is practical, close all building doors and windows and 
all  doors  between  the  space  in  which  the  appliances  remaining 
connected to the common venting system are located and other 
spaces of the building. Turn on clothes dryers and any appliance 
not connected to the common venting system. Turn on any exhaust 
fans,  such  as  range  hoods  and  bathroom  exhausts,  so  they  will 
operate at maximum speed. Do not operate a summer exhaust fan. 
Close fireplace dampers.
Place  in  operation  the  appliance  being  inspected.  Follow  the 
lighting  instructions. Adjust  thermostat  so  appliance  will  operate 
continuously.
Test for spillage at the draft hood relief opening after 5 minutes of 
main burner operation. Use the flame of a match or candle, or smoke 
from a cigarette, cigar or pipe.
After  it  has  been  determined  that  each  appliance  remaining 
connected to the common venting system properly vents when tested 
as outlined above, return doors, windows, exhaust fans, fireplace 
dampers  and  any  other  gas-burning  appliance  to  their  previous 
condition of use.
Any improper operation of the common venting system should be 
corrected so the installation conforms with the National Fuel Gas Code, 
ANSI Z223.1 and/or CAN/CSA B149, Installation Codes. When resizing 
any portion of the common venting system, the common venting system 
should be resized to approach the minimum size as determined using 
the appropriate tables in Appendix F in the National Fuel Gas Code, 
ANSI Z223.1 and/or CAN/CSA B149 Installation Codes.
REMOVAL OF EXISTING BOILER FROM A COMMON VENTING SYSTEM
GENERAL  MAINTENANCE
These boilers are designed to give many years of efficient and 
satisfactory  service  when  properly  operated  and  maintained. 
To  assure  continued  good  performance,  the  following 
recommendations are made.
The area around the unit should be kept clean and free from lint and 
debris.  Sweeping the floor around the boiler should be done carefully.  
This will reduce the dust and dirt which may enter the burner and 
pilot air passages, causing improper combustion and sooting.
THE FLOW OF COMBUSTION AND VENTILATION AIR TO THE 
BOILER MUST NOT BE OBSTRUCTED.
THE  BOILER  AREA  MUST  BE  KEPT  CLEAR  AND  FREE 
FROM  COMBUSTIBLE  MATERIALS,  GASOLINE, AND  OTHER 
FLAMMABLE VAPORS AND LIQUIDS.
Any safety devices including low water cutoffs used in conjunction 
with this boiler should receive periodic (every six months) inspection 
to assure proper operation. A low water cutoff device of the float 
type should be flushed every six months. All relief valves should be 
inspected and manually operated at least twice a year. More frequent 
inspections may be necessary depending on water conditions.
Periodic checks, at least twice a year, should be made for water 
and/or gas leaks.
More  frequent  inspections  may  be  necessary  depending  on  
water conditions.
The boiler mounted gas and electrical controls have been designed to 
give both dependable service and long life. However, malfunction can 
occur, as with any piece of equipment. It is therefore recommended 
that all components be checked periodically by a qualified serviceman 
for proper operation.
MANUAL RESET HIGH LIMIT SWITCH CONTINUITY TEST
Do not depress the switch reset button prior to testing. With the 
unit cold, disconnect the leads from the switch.  With a multimeter 
place a probe on each side of the switch.  If the meter reads zero 
the switch is good.  If you receive an infinite or OL signal, the reason 
could be:
1.  Protector switch contacts open.
•    Depress reset button on switch (switch cannot be reset until 
water temperature in the boiler coils drop below 200°F). Meter 
should read zero.
2.  Defective switch or bad leads.
•  With leads attached, depress the switch button.  If the meter does 
not read zero, the switch is defective and must be replaced.
RELIEF VALVE
The safety relief valve should be opened at least twice a year to 
check its working condition. This will aid in assuring proper pressure 
relief protection. Lift the lever at the top of the valve several times 
until the valve seats properly and operate freely.
 DANGER
THE WATER PASSING OUT OF THE VALVE DURING CHECKING 
OPERATION MAY BE EXTREMELY HOT. BEFORE OPERATING 
RELIEF  VALVE  MAKE  SURE  DRAIN  LINE  IS  INSTALLED  TO 
DIRECT DISCHARGE TO A SAFE LOCATION SUCH AS AN OPEN 
DRAIN, TO AVOID SCALDING OR WATER DAMAGE.
 WARNING
SHOULD OVERHEATING OCCUR OR THE GAS SUPPLY FAIL 
TO SHUT OFF, TURN THE MANUAL GAS CONTROL VALVE TO 
THE APPLIANCE.