ATTO Technology 1180D ユーザーガイド
14
Installation: FibreBridge 1290E
LED indicators
The faceplate shows two dual-stacked LEDs and
a single LED. The green dual-stacked LED
indicates FC activity, the other FC link speed.
Another green dual-stacked LED indicates SCSI
activity on each of the SCSI ports, and the single
LED indicates Ready status.
The faceplate shows two dual-stacked LEDs and
a single LED. The green dual-stacked LED
indicates FC activity, the other FC link speed.
Another green dual-stacked LED indicates SCSI
activity on each of the SCSI ports, and the single
LED indicates Ready status.
FC Activity:
The LED blinks to show activity on
the Fibre Channel port (numbered 0). During very
high activity, the LED may appear to be steadily
lit.
lit.
FC Link Speed:
a lit LED indicates the
FibreBridge is using 2-Gigabit.
SCSI Activity:
shows activity on the SCSI bus
(numbered 0 and 1).
Ready:
should light after power has been applied
to indicate the board has completed the
initialization process without any failures and is
ready to handle data transfers.
initialization process without any failures and is
ready to handle data transfers.
Installation instructions
1
Mount the FibreBridge in your device.
2
Connect a SCSI device to the FibreBridge.
Connect the Fibre Channel port to your
SAN.Connect the Ethernet cable from the Fibre
Bridge to your computer. Refer to
Connect the Fibre Channel port to your
SAN.Connect the Ethernet cable from the Fibre
Bridge to your computer. Refer to
3
Connect the power connector.
4
Apply power.
5
Access FibreBridge Services using the
QuickNAV utility. Refer to
QuickNAV utility. Refer to
6
Go to the ExpressNAV Restart page and
restart the FibreBridge.
restart the FibreBridge.
7
Map your devices.Refer to
8
Boot the computers on the SAN and check the
configuration. Refer to
configuration. Refer to
Additional
configurations
on page 17.
Exhibit 1.4-1 Board layout showing mounting holes and connectors.