ATTO Technology 1180D ユーザーガイド

ページ / 109
14
Installation: FibreBridge 1290E
LED indicators
The faceplate shows two dual-stacked LEDs and 
a single LED. The green dual-stacked LED 
indicates FC activity, the other FC link speed. 
Another green dual-stacked LED indicates SCSI 
activity on each of the SCSI ports, and the single 
LED indicates Ready status.
FC Activity:  
The LED blinks to show activity on 
the Fibre Channel port (numbered 0). During very 
high activity, the LED may appear to be steadily 
lit.
FC Link Speed:  
a lit LED indicates the 
FibreBridge is using 2-Gigabit. 
SCSI Activity: 
shows activity on the SCSI bus 
(numbered 0 and 1).
Ready:  
should light after power has been applied 
to indicate the board has completed the 
initialization process without any failures and is 
ready to handle data transfers.
Installation instructions 
1
Mount the FibreBridge in your device.
2
Connect a SCSI device to the FibreBridge. 
Connect the Fibre Channel port to your 
SAN.Connect the Ethernet cable from the Fibre 
Bridge to your computer. Refer to 
3
Connect the power connector.
4
Apply power.
5
Access FibreBridge Services using the 
QuickNAV utility. Refer to 
6
Go to the ExpressNAV Restart page and 
restart the FibreBridge.
7
Map your devices.Refer t
8
Boot the computers on the SAN and check the 
configuration. Refer to 
Additional 
configurations
 on page 17.
Exhibit 1.4-1  Board layout showing mounting holes and connectors.