Zhone 2000 ユーザーガイド

ページ / 296
V e r i f i c a t i o n
205
C
H A P T E R
C
HAPTER
 8
V
ERIFICATION
This chapter describes how to verify that the 2000 Series IADs operate 
properly after installation. It also covers maintenance and how to display the 
current configuration. Before you can test the voice capabilities of the IAD, 
you must first provision it at the voice gateway and configure the voice 
application and parameters.
Power-up Test
The IAD displays an indication of normal operation when you first power it 
up. When you power it up, verify that the POWER indicator on the front 
panel lights green.
Operational Test
Follow the procedure below to verify that the IAD is operating properly after 
installation. This procedure assumes that
You have configured Directory numbers (DNs) in the Class 5 switch for the 
associated Voice Ports.
The IAD has been connected to a terminal emulator via the console port, 
displays the normal boot sequence and you can log in.
You have configured PVCs at the DSLAM (default data = 0, 38; default 
voice is 0, 39) when using ATM. 
You have provisioned a data network. 
You connected and configured a WAN link at the associated DSLAM or 
You have a PC with Telnet, and an Ethernet adapter running TCP/IP. For 
For testing, you and a counterpart logged on to the upstream voice gateway 
can communicate via telephone or cell phone.