Jet 690082 jtm-1 - 9" x 42" 2 hp 3-phase vertical milling machine ユーザーガイド

ページ / 36
 
10
8.3  Site preparation 
The mill must be placed on an even surface and 
bolted to the floor. Anchor bolts of sufficient size 
and length must be fastened to the floor according 
to the mill’s footprint. See the site installation 
diagram in Figure 1. 
8.4  Lifting the mill 
Finish removing the sides of the crate. Leave mill 
bolted to pallet until ready to move to its final 
location. 
The preferred method for lifting mill is with a hook 
through the hoisting ring screwed into the tapped 
hole atop the ram. Steady mill to prevent it from 
spinning. 
An alternative method for lifting mill is with a sling. 
Follow diagram in Figure 1 for proper position of 
sling under ram. Note position of ram and that table 
has been moved against column. Tighten ram 
locking bolts (A, Figure 4) before lifting. 
 
Figure 4:  sling location 
Carefully lift mill and move to a position over the 
anchor bolts. Lower mill over anchor bolts and 
check for level, with a machinist’s level placed on 
the table. Mill must be level back to front and side 
to side. Shim if necessary, but remember that mill 
must be supported equally at all four corners. 
Check for level before tightening anchor bolt nuts, 
and check again after tightening them. 
It is advisable when placing the mill on a concrete 
floor to use grout (thin mortar) to correct any 
unevenness in the concrete and provide a solid 
foundation at all points.  
 Mill must be supported equally 
under all four corners. Failure to comply may 
cause the column to twist and put a bind in the 
ways.  
8.5  Completing assembly 
 Before attempting to raise mill 
head, familiarize yourself with instructions in 
section 12.1
, for procedures to safely raise and 
set up the mill head. 
1.  Loosen four hexagonal nuts (see A, Figure 9) 
about 1/4 turn each counterclockwise, just 
enough to allow rotation of head. 
2.  Apply upward pressure on motor by hand to 
relieve pressure on worm mechanism, and use 
supplied wrench to turn worm nut and raise 
head to upright position. 
3.  Slightly tighten nuts (A, Figure 9); not torqued, 
just snug. Before operating mill, follow 
procedures in section 12.1 to verify angle 
settings and properly tighten the four nuts.
  
4.  Use mineral spirits, kerosene or other cleaning 
solvent, to remove all rust-proofing from where 
it may have been applied. This is important; 
moving the table or any other components 
before removing rust proofing will only put rust 
proofing where you don’t want it. (Do not use 
gasoline, paint thinner, or lacquer thinner; 
these will damage painted surfaces.) 
5.  Lubricate exposed ways (see sect. 13.0), then 
move each unit (table and ram) to the opposite 
limit stop, and clean and lubricate the newly 
exposed ways. Loosen bolts to unlock ram and 
move it forward and backward to the full length 
in order to clean and lubricate. 
6.  Cover all machined surfaces with a film of light 
machine tool oil to inhibit rust.  
Some of the following steps may have already 
been performed on the machine. If so, ignore the 
instructions related to those particular steps. 
Otherwise, perform them in the order listed. Refer 
to Figures 2 and 5 to help locate items. 
7.  Install the table traverse and cross-feed 
handles on their respective shafts. Tighten 
each handle using a wrench on the flats. 
8.  Remove any rust proofing from drawbar. Install 
drawbar with its washer into spindle center 
through top of head assembly. When installing 
tool into spindle, lock spindle and tighten 
drawbar using provided wrench.  
9.  Slide the fine feed handwheel over the hub 
and push it back until its roll pin engages hole 
in hub, and handwheel is flush with hub 
surface. 
10. Place coarse feed handle on feed shaft, 
aligning roll pin with a hole. Tap handle lightly 
until it is flush against hub surface.