Unpacking and Clean-Up
1. Remove the shipping crate.
2. Remove the protective coating from all rust
protected surfaces with a soft cloth
moistened with kerosene or a mild solvent.
Do not use acetone, gasoline, or paint
thinner, as these may damage painted
surfaces.
moistened with kerosene or a mild solvent.
Do not use acetone, gasoline, or paint
thinner, as these may damage painted
surfaces.
3. To prevent rust, apply a thin coat of metal
sealer to the table.
Lifting the JDP-20EVS
Keep people a safe distance
away from the drill press while it is being
moved. Failure to comply may cause damage
to property and/or serious bodily injury.
moved. Failure to comply may cause damage
to property and/or serious bodily injury.
1. Make sure the two head locking bolts (refer
to A, Fig. 4) are tight prior to lifting.
2. Position the JDP-20EVS next to the area
that will be used for the machine.
3. The “Lifting Point” should be used to raise
the drill press off of the shipping pallet.
4. Lift the machine at the “Lifting Point” with a
forklift. Use a 2x4 on the fork to protect the
head.
head.
NOTE: You should remove the coolant hose
holder so that it is not damaged during
lifting.
holder so that it is not damaged during
lifting.
Installation
The drill press must be located in a dry, well-
lighted area with adequate room on all sides of
the machine. The floor must be level and the
drill press must rest solidly on the floor. The
most accurate and vibration free operation will
require the drill press to be bolted to the floor.
While this is not absolutely necessary, it is highly
recommended. Place shims near the four bolt
holes to level the drill press, if necessary. Figure
2 shows the hole dimensions of the base. Equal
pressure should be applied to all four nuts when
tightening to prevent distortion of the base.
lighted area with adequate room on all sides of
the machine. The floor must be level and the
drill press must rest solidly on the floor. The
most accurate and vibration free operation will
require the drill press to be bolted to the floor.
While this is not absolutely necessary, it is highly
recommended. Place shims near the four bolt
holes to level the drill press, if necessary. Figure
2 shows the hole dimensions of the base. Equal
pressure should be applied to all four nuts when
tightening to prevent distortion of the base.
Figure 1