Jet ghd-20 ユーザーガイド

ページ / 28
 
6
  Read and understand the 
entire contents of this manual before 
attempting set-up or operation. Failure to 
comply may cause serious injury.
 
Unpacking and Clean-Up 
1.  Remove the shipping crate. 
2.  Remove the protective coating from all rust 
protected surfaces with a soft cloth 
moistened with kerosene or a mild solvent.  
Do not use acetone, gasoline, or paint 
thinner, as these may damage painted 
surfaces. 
3.  To prevent rust, apply a thin coat of metal 
sealer to the table. 
Lifting the JDP-20EVS 
  Keep people a safe distance 
away from the drill press while it is being 
moved. Failure to comply may cause damage 
to property and/or serious bodily injury.
 
 
1.  Make sure the two head locking bolts (refer 
to A, Fig. 4) are tight prior to lifting. 
2.  Position the JDP-20EVS next to the area 
that will be used for the machine. 
3.  The “Lifting Point” should be used to raise 
the drill press off of the shipping pallet. 
4.  Lift the machine at the “Lifting Point” with a 
forklift.  Use a 2x4 on the fork to protect the 
head. 
NOTE: You should remove the coolant hose 
holder so that it is not damaged during 
lifting. 
 
 
Installation 
The drill press must be located in a dry, well-
lighted area with adequate room on all sides of 
the machine. The floor must be level and the 
drill press must rest solidly on the floor.  The 
most accurate and vibration free operation will 
require the drill press to be bolted to the floor.  
While this is not absolutely necessary, it is highly 
recommended. Place shims near the four bolt 
holes to level the drill press, if necessary. Figure 
2 shows the hole dimensions of the base. Equal 
pressure should be applied to all four nuts when 
tightening to prevent distortion of the base. 
 
   
 
 
Figure 1 
 
 
Figure 2