Craftsman 54985 ユーザーズマニュアル

ページ / 76
ASSEMBLY STEP 4
Install the Chain/Cable
1. Pull the cable around the idler pulley and toward the trolley.
2. Connect the cable to the retaining slot on the trolley, as shown
(Figure 1).
a. Push pins of master link bar through cable link and trolley
slot.
b. Push master link cap over pins and past pin notches.
c. Slide clip-on spring over cap and onto pin notches until
both pins are securely locked in place.
3. With the trolley against the screwdriver, dispense the
remainder of the cable/chain along the rail toward the motor
unit around the sprocket and continuing to the trolley
assembly. The sprocket teeth must engage the chain.
(Figure 2)
4. Check to make sure the chain is not twisted, then connect it to
the threaded shaft with the remaining master link.
5. Thread the inner nut and lock washer onto the trolley threaded
shaft.
6. Insert the trolley threaded shaft through the hole in the trolley.
Be sure the chain is not twisted. (Figure 3)
7. Loosely thread the outer nut onto the trolley threaded shaft.
8. Remove the screwdriver.
To avoid possible SERIOUS INJURY to finger from moving
garage door opener:
l
ALWAYS keep hand clear of sprocket while operating opener.
l
Securely attach sprocket cover BEFORE operating.
10
Sprocket
Leave Chain and Cable
Inside Bag to 
Prevent Kinking.
Master Link
Nut 5/16"
Trolley Threaded Shaft
Lock Washer 5/16"
HARDWARE SHOWN ACTUAL SIZE
Figure 2
Master Link
Threaded Shaft
Outer Nut
Master Link
Inner Nut
Lock Washer
Figure 3
Figure 1
Keep Chain and Cable
Taut When Dispensing