AEG PROTECT 1.11 ユーザーズマニュアル

ページ / 61
31
Alternatively, the 10 kVA UPS system can also be connected 
via a multi-wire rubber-sheathed cable.
5.4
Mains Connection
5.4.1
Preparation for the three-phase mains connection
Before connection work is performed on the UPS, make sure 
that:
The values of the nominal voltage (supply) and 
frequency match those on the nameplate of the UPS. 
The earth connection matches the prescribed IEC 
standards or the local regulations,
The UPS can be connected to the electrical mains via a 
separate supply line equipped with fuses in the supply-
side MI distribution. 
Back-up fuses or line safety switches are used that 
correspond to the values listed in chapter 5.2.2.
The connection cable from the back-up fuse to the UPS
is configured with a minimum cross-section acc. to 
chapter 5.2.2 “Connection Cross-Sections and Fuse 
Protection”.
The  UPS  can  be  live,  and  the  voltage  can  be 
dangerous. The unit may only be installed and 
if  necessary  opened  by  trained  and  qualified 
personnel. Repairs may only be carried out by 
qualified customer service staff!
5.4.2
Connection of the Three-Phase Input Mains Voltage
In  order  to  ensure  the  safety  of  personnel  during  installation 
work,  make  sure  that  the  connections  are  made  under  the 
following conditions:
No mains voltage present.
The loads are switched off.
The PROTECT 1. is switched off (display completely 
blank).
To disconnect the  PROTECT 1, carry out the following steps
as well: